January
In the Time Usage report, we have introduced a new "Shift Time" column, which combines planned time and planned stops (excluding OEE) and appears as the last column in the table.
With this, users can also choose between "Percent (Planned Time)" and "Percent (Shift Time)" for the y-axis, reflecting percentages based either planned time or shift time and allowing for more tailored data visualization. E.g. when "Percent (Planned Time)" is selected, then Planned stops (excl. from OEE) are not shown.
Furthermore, all columns and rows show reflect percent calculations both in relation to planned time and shift time.
For any questions or assistance, please contact our support team.
In-app support experience
We’ve replaced the support chat flow with a form for in-app support requests. The new form offers a user-friendly design with clear steps, making it easier to contact Evocon’s support. Simply describe your issue, we’ll automatically retrieve your logged-in email and other relevant information, and get back to you as soon as possible.Reports
In the Downtime report, selecting Reasons, Groups, or Locations as the x-axis now calculates each row’s percentage of planned time based on the total planned time across all rows. For other x-axis options like Stations, percentages are determined individually per row. To improve clarity, two new columns—"Duration (incl. in OEE)" and "Planned Time"—have been added, as the percentage of planned time is derived from these values.Shift View
Each station now displays its OEE targets. The “happy” target is visualized in the OEE widget, appearing above the current OEE value and visible when hovering over Mr Evocon. Learn more about OEE targets