Set-Up Checklist
Pre-Requisites
Client
- [ ] Wired internet connection provided (4G router alternative possible)
- [ ] PC with a monitor, keyboard, and mouse or a tablet is provided. Tablet preferably an iPad
- [ ] If required, obtained a confirmation from the IT department to run the trial.
- [ ] A product champion who will lead the Evocon trial
- [ ] Agreement between Evocon, Partner, and Client on how to monitor the process
Partner
- [ ] Provided guidance on Evocon support channels that are available
- [ ] Gathered all information required to start the trial (see the partner’s free trial success guide)
Hardware Implementation
Client
- [ ] Provided exact shipping instructions (full address, recipient, phone number)
- [ ] Receiving the hardware package confirmed
- [ ] Hardware set up for the free trial machine(s) in 30 days after receiving the hardware from Evocon.
Evocon
- [ ] Provide guidance on a solution to monitor production (and scrap)
- [ ] Hardware package put together
- [ ] Hardware package sent out to the client

Resources
Hardware - Evocon IIoT device 3 - How to connect a relay
Hardware - Evocon IIoT device 3 - How to connect a sensor